• RANCANG BANGUN SISTEM CLAMPING FORMING STRIP BERBASIS PNEUMATIK PADA PRODUKSI MULTI POCKET DI PT FARRINDO NUSANTARA INDUSTRI

  • Back
 by 

Program Studi Mesin Industri 2026

Mahasiswa: Khairu Nabiel Al Hakim, Randy Julianto Saputra

Pembimbing: Agatha Amidya Putra, M.T.

ABSTRAK/ABSTRACT

Proses clamping forming strip pada produksi multi pocket di PT Farrindo Nusantara Industri masih dilakukan secara manual sehingga menyebabkan hasil penjepitan kurang konsisten, bergantung pada keterampilan operator, serta berpotensi memperpanjang waktu proses produksi. Kondisi tersebut mendorong perlunya pengembangan sistem penjepitan yang mampu meningkatkan kestabilan proses sekaligus mempermudah pekerjaan operator. Oleh karena itu, pada tugas akhir ini dilakukan rancang bangun sistem clamping forming strip berbasis pneumatik sebagai pengganti metode penjepitan manual.

Sistem yang dirancang menggunakan aktuator pneumatik berupa double acting cylinder yang dikendalikan melalui rangkaian pneumatik sehingga proses penjepitan dapat dilakukan secara lebih stabil dan mudah dioperasikan. Tahapan perancangan meliputi identifikasi permasalahan melalui observasi dan wawancara, analisis menggunakan diagram Pareto dan Fishbone, penyusunan konsep desain menggunakan matrix morphology, perhitungan mekanik dan pneumatik, pembuatan alat, perakitan, serta pengujian sistem. Hasil pengujian menunjukkan bahwa sistem clamping forming strip berbasis pneumatik mampu berfungsi sesuai dengan prinsip kerja yang dirancang dan menghasilkan proses penjepitan yang lebih stabil dibandingkan metode manual. Pada metode penjepitan tanpa hold, rata-rata waktu proses berhasil diturunkan dari 21 detik menjadi 16 detik atau mengalami peningkatan efisiensi sebesar 23,81% dibandingkan metode manual. Dengan demikian, sistem yang dirancang dapat meningkatkan efektivitas dan konsistensi proses penjepitan serta mendukung peningkatan efisiensi proses produksi multi pocket di PT Farrindo Nusantara Industri.

Kata Kunci: Clamping Forming Strip, Pneumatik, Multi Pocket, Double Acting

The clamping forming strip process in the multi pocket production line at PT Farrindo Nusantara Industri is still performed manually, resulting in inconsistent clamping quality, dependence on operator skills, and longer production processing time. These conditions indicate the need for a clamping system capable of improving process stability while simplifying the operator’s work. Therefore, this final project focuses on the design and development of a pneumatic-based clamping forming strip system as a replacement for the manual clamping method.

The proposed system utilizes a double-acting pneumatic cylinder controlled through a pneumatic circuit, enabling a more stable and easier clamping operation. The design process includes problem identification through observation and interviews, analysis using Pareto and Fishbone diagrams, concept development using a morphological matrix, mechanical and pneumatic calculations, fabrication, assembly, and system testing. The test results show that the proposed pneumatic-based clamping forming strip system operates according to the intended working principle and provides a more stable clamping process than the manual method. Using the non-hold clamping method, the average processing time was reduced from 21 seconds to 16 seconds, representing an efficiency improvement of 23.81% compared to the manual method. Therefore, the proposed system is expected to improve the effectiveness and consistency of the clamping process while supporting higher production efficiency in the multi pocket production line at PT Farrindo Nusantara Industri.

Keywords: Clamping Forming Strip, Pneumatic System, Double-Acting Cylinder, Multi Pocket

DAFTAR PUSTAKA

L. Jiping, Z. Faping, Z. Jianhua, Q. Hanbo, and M. Ning, “Quantitative Optimization of Workpiece-fixture System’s Clamping Forces,” International Journal of Computational Intelligence Systems, vol. 4, no. 3, pp. 402–403, 2011.

H. Qi, Y. Srijana, G. Sheng, X. Zhiwei, and W. Xiyeng, “Analysis of Adaptive Clamping Force of Fixture Based on Finite Element Method,” IOP Conference Series: Materials Science and Engineering, vol. 423, no. 012116, 2018.

E. A. Indah dan Y. Rahmadoni H., “Pengembangan Mesin Pemotong Sandal Hotel dengan Menggunakan Sistem Pneumatik,” Tugas Akhir, D3 Teknik Mesin Industri, Fakultas Vokasi, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia, 2018.

M. A. Setiawan dan I. Riyanto, “Sistem Kendali Tekanan Udara pada Kompresor dengan Pengaturan Kecepatan Motor 3 Fasa,” Jurnal Maestro, vol. 2, no. 1, pp. 204–211, Apr. 2019.

Medium Multi pocket, PT Farrindo Nusantara Industri, Bekasi, Indonesia.

M. A. A. Marzuqi, “Analisis Gerakan Cylinder Double acting pada Alat Peraga Elektro Pneumatik,” Laporan Tugas Akhir, Program Studi DIII Teknik Mesin, Politeknik Harapan Bersama, Tegal, Indonesia, 2021.

R. Averil, A. Halim, dan A. P. Irawan, “Desain dan Analisis Pencapit pada Gripper Pneumatik untuk Pick and Place Menggunakan Metode FEA,” Jurnal Serina Sains, Teknik dan Kedokteran, vol. 2, no. 2, pp. 9–18, 2024.

M. A. Arsyandi, Muqimuddin, dan F. A. Pratikno, “Pengurangan Lead Time pada Proses Assembly dengan Menggunakan Pendekatan Lean Manufacturing (Studi Kasus: PT KRA),” Jurnal Optimasi Teknik Industri, pp. 1–9, 2023.

S. Andalucia, “Operasi dan Troubleshooting Gas Compressor di Stasiun Kompresor Gas (SKG) Lembak PT Pertamina Hulu Rokan Region 1 Zona 4,” Jurnal Cakrawala Ilmiah, vol. 2, no. 5, pp. 2133–2151, Jan. 2023.

A. Rofii, S. Gunawan, dan A. Mustaqim, “Rancang Bangun Sistem Pengaman Pintu Gudang Berbasis Internet of Things (IoT) dan Sensor Fingerprint,” Jurnal Kajian Teknik Elektro, vol. 6, no. 2, pp. 70–76, Sep. 2021.

N. R. Tague, “Fishbone Diagram,” The Quality Toolbox, 2nd ed., Milwaukee, USA: William A. Tony, 2005, ch. 5.

A. Syukron dan M. Kholil, “Pareto Analysis,” Six Sigma Quality For Business Improvement, ed. 1, cet. 1, Yogyakarta, Indonesia: GRAHA ILMU, 2013, ch. 3, sec. 3.2, pp. 73–74.

A. Siswoyo, “Optimization of Rice Planting Practices using Gripper Technology in Robot Application,” Jurnal Teknologi, vol. 14, no. 1, pp. 1–7, 2024.

I. Hasan, Denur, dan L. Hakim, “Rancang Bangun Alat Pres Ban Sistem Pneumatik untuk Sepeda Motor,” SURYA TEKNIKA, vol. 10, no. 1, pp. 749–754, 2023.

TOSIN and Rijanto, Mekanika Teknik Bahan: Dimensi, Beban, Bahan, Edisi Revisi. Cikarang: Akademi Teknik Mesin Industri (ATMI) Cikarang, 2012.

Category: Tugas Akhir - Comments: Comments Off on RANCANG BANGUN SISTEM CLAMPING FORMING STRIP BERBASIS PNEUMATIK PADA PRODUKSI MULTI POCKET DI PT FARRINDO NUSANTARA INDUSTRI